Pemilihan pam & sokongan bekalan global+86 151 2119 9987 · dfin88@dfinsewagepump.com
MVX-500 Pam dos

Imej rujukan. Pembinaan akhir mengikut model dan sebut harga yang disahkan.

Pam pemeteran

MVX-500 Pam dos

Model: MVX-500

MVX-500 Pam dos. 50Hz: 28.8; 5 kgf/cm2.

Bincangkan aplikasi ini

DATA TEKNIKAL

Spesifikasi, prestasi dan pembinaan

Nilai katalog adalah data rujukan. Titik operasi akhir mesti diperiksa terhadap sistem sebenar dan model yang dipilih.

MVX-500 Metering Pump

MVX-500 is a MVX series metering pump available through DFIN PUMP. The model-specific catalogue data below provides a starting point for technical selection. Quote the complete model designation when requesting a quotation; similar series names do not establish interchangeable components or identical duty.

Model-specific technical data

ParameterCatalogue value
Maximum dosing flow (L/h)50Hz: 28.8
Maximum discharge pressure5 kgf/cm2

Catalogue values are reference data for the stated configuration. Confirm the offered specification and operating conditions before ordering.

Performance and configuration

Maximum dosing capacity and maximum discharge pressure are separate selection limits. Confirm the required delivery at the actual discharge pressure and adjustment setting. Electrical values, where provided, apply only to the listed configuration. Missing frequency, motor rating or connection information is not inferred from other models.

Application assessment

Provide the liquid composition, concentration, temperature, density, viscosity, solids content and required operating schedule. Confirm compatibility of all wetted components with the actual liquid. General series descriptions are not a chemical compatibility certificate. Materials, dry-running capability, hazardous-area approvals and sanitary compliance require explicit confirmation for the offered equipment.

Installation planning

Confirm the final connection standard, outline drawing, mounting arrangement and maintenance clearance before completing pipework. The catalogue connection sizes do not establish flange drilling or thread standards. Account for static lift, pipe friction, valve losses and downstream pressure when defining the required duty. Provide safe isolation and independently supported pipework as appropriate to the confirmed equipment.

Commissioning and maintenance

Follow the instructions supplied with the selected equipment. Confirm the electrical supply, protection and rotation requirements before starting. Check the actual flow, pressure and motor load against the confirmed operating envelope. Stop and investigate unusual vibration, leakage, overheating or loss of liquid supply. Isolate, depressurize and make the equipment safe before inspection or replacement of service parts.

Quotation checklist

Send DFIN PUMP the full model MVX-500, required duty, liquid properties, installation details, supply voltage and frequency, connection requirements and requested accessories. For dosing service, include the discharge pressure and control method; for filtration service, include the required retention level and contamination load. Final materials, dimensions, options and delivery scope follow the confirmed quotation.

Product artwork represents the corresponding series. Model-specific values are listed in the technical table; illustration geometry is not a dimensioned installation drawing.

Dosing-system selection

Define the required dose in litres per hour at the actual injection pressure. Include the adjustment range, control signal, liquid concentration and available suction conditions in the enquiry. If pressure values appear as multiple options, confirm which configuration supplies the required delivery; the largest flow and pressure figures are not automatically a paired operating point.

Selection question: Is maximum dosing capacity the correct setting?

Not necessarily. The required chemical dose depends on the process flow and target concentration. Request the delivery characteristic and calibration procedure for the offered configuration.

Request the MVX-500 configuration

The table on this page refers specifically to MVX-500. If frequency is not listed, confirm it in the quotation. Ask for a dimensioned drawing and an itemized delivery scope before approving a replacement or a new installation.

SOKONGAN PEMILIHAN

Pemilihan pam berasaskan aplikasi

Hantar keadaan operasi sebenar dan bukannya nama model sahaja. Jurutera kami akan membandingkan titik tugas, keperluan pembinaan dan pemasangan sebelum sebut harga.

Bincangkan aplikasi ini
PERLUKAN SOKONGAN PEMILIHAN?

Hantarkan tempat bertugas anda kepada kami. Jurutera kami akan mengesyorkan pam yang sepadan.

Bercakap dengan jurutera