Pompa seçimi ve küresel tedarik desteği+86 151 2119 9987 · dfin88@dfinsewagepump.com
MZK-40-1 Proses pompası

Referans resmi. Nihai inşaat, onaylanmış modele ve teklife göre yapılır.

Santrifüj ve hat tipi pompalar

MZK-40-1 Proses pompası

Model: MZK-40-1

MZK-40-1 Proses pompası. 50; 40; 1 HP.

Bu uygulamayı tartışın

TEKNİK VERİLER

Özellikler, performans ve yapı

Katalog değerleri referans verileridir. Nihai çalışma noktası, gerçek sistem ve seçilen modele göre kontrol edilmelidir.

MZK-40-1 Process Pump

MZK-40-1 is a MZK series process pump available through DFIN PUMP. The model-specific catalogue data below provides a starting point for technical selection. Quote the complete model designation when requesting a quotation; similar series names do not establish interchangeable components or identical duty.

Model-specific technical data

ParameterCatalogue value
Inlet (mm)50
Outlet (mm)40
Motor power1 HP
Catalogue full-flow value (L/min)50Hz: 275
Catalogue full-head value (m)50Hz: 15

Catalogue values are reference data for the stated configuration. Confirm the offered specification and operating conditions before ordering.

Performance and configuration

Full-flow and full-head catalogue values must not be interpreted as a guaranteed simultaneous duty. Obtain a performance curve for the selected configuration. Electrical values, where provided, apply only to the listed configuration. Missing frequency, motor rating or connection information is not inferred from other models.

Application assessment

Provide the liquid composition, concentration, temperature, density, viscosity, solids content and required operating schedule. Confirm compatibility of all wetted components with the actual liquid. General series descriptions are not a chemical compatibility certificate. Materials, dry-running capability, hazardous-area approvals and sanitary compliance require explicit confirmation for the offered equipment.

Installation planning

Confirm the final connection standard, outline drawing, mounting arrangement and maintenance clearance before completing pipework. The catalogue connection sizes do not establish flange drilling or thread standards. Account for static lift, pipe friction, valve losses and downstream pressure when defining the required duty. Provide safe isolation and independently supported pipework as appropriate to the confirmed equipment.

Commissioning and maintenance

Follow the instructions supplied with the selected equipment. Confirm the electrical supply, protection and rotation requirements before starting. Check the actual flow, pressure and motor load against the confirmed operating envelope. Stop and investigate unusual vibration, leakage, overheating or loss of liquid supply. Isolate, depressurize and make the equipment safe before inspection or replacement of service parts.

Quotation checklist

Send DFIN PUMP the full model MZK-40-1, required duty, liquid properties, installation details, supply voltage and frequency, connection requirements and requested accessories. For dosing service, include the discharge pressure and control method; for filtration service, include the required retention level and contamination load. Final materials, dimensions, options and delivery scope follow the confirmed quotation.

Product artwork represents the corresponding series. Model-specific values are listed in the technical table; illustration geometry is not a dimensioned installation drawing.

Process duty assessment

Define the required flow at the total system head, including static elevation and piping losses. Provide liquid properties and inlet conditions for a duty review. The series illustration does not establish materials, dimensions or optional certifications.

Selection question: How is the final duty confirmed?

Ask for the performance curve and operating envelope for the quoted configuration, then compare them with the system requirement. Do not select only by motor power or connection diameter.

Request the MZK-40-1 configuration

The table on this page refers specifically to MZK-40-1. If frequency is not listed, confirm it in the quotation. Ask for a dimensioned drawing and an itemized delivery scope before approving a replacement or a new installation.

SEÇİM DESTEĞİ

Uygulamaya dayalı pompa seçimi

Yalnızca model adı yerine gerçek çalışma koşullarını gönderin. Mühendislerimiz teklif vermeden önce çalışma noktası, inşaat ve kurulum gereksinimlerini karşılaştıracaktır.

Bu uygulamayı tartışın
SEÇİM DESTEĞİNE Mİ İHTİYACINIZ VAR?

Bize görev noktanızı gönderin. Mühendislerimiz size uygun bir pompa önerecektir.

Bir mühendisle konuşun.